Large Commercial Projects

Client: Victory Hotel
Location: Cnr Edward and Charlotte streets, Brisbane

In mid 2008, The Victory was significantly damaged by a major fire which destroyed approximately 40% of the hotel.

C.P. Cowie Builders were retained by Precision Group to reinstate The Victory in the original style and finishes sympathetic to the 150 year old establishment.

C.P. Cowie Builders project managed and undertook the construction post fire cleaning. This entailed taking all damaged timbers and finishes back to basics and rebuilding from scratch.

These works included Basement integrity works, flooring, ceilings, upper level flooring, roof trusses and cladding together with all associated electrical, plumbing and full replacement of air conditioning system works.

CP Cowie Builders  finished this major project within the proposed time-frame and on budget.

……………………………………………………………………………………………………………………………………………………………

Client: Magic Hand Car Wash, Building 1
Location: Carindale Shopping Centre

This detailed construct project involved the extensive renovation of an existing restaurant for Magic Hand Car Wash.  Time was critical for this project given the business was scheduled for operation.  The project took place both within CP Cowie Builders operating hours and after hours to ensure successful completion.  CP Cowie Builders completed the project two (2) weeks ahead of schedule.

……………………………………………………………………………………………………………………………………………………………

Client: Magic Hand Car Wash, Building 2
Location: Carindale Shopping Centre

This project involved a combination of full plumbing, water recycling treatment plants, electrical installations and general building works.  The project also included delivering all new wash bays.  This project was delivered three (3) weeks ahead of schedule.

…………………………………………………………………………………………………………………………………………………………….

Client: Sculpture on Clay
Location:  Coorparoo

Our client is a highly recognised hairstylist who had a magnificent vision for their new salon at Coorparoo.  The design process was completed by CP Cowie Builders and construction commenced once the final design was approved.

CP Cowie Builders, in our design were able to implement many of our own improvements to the original Functional Design Brief.  These improvements assisted with customer capacity and workflow processes and movement.

…………………………………………………………………………………………………………………………………………………………….

Client:  Queensland Academy of Fitness
Location:  Coorparoo

CP Cowie undertook this three month project for the Queensland Academy of Fitness which included the renovation of a large warehouse and the construction of purpose designed reception areas, fitness & massages training rooms, fitness assessment facilities and customized Personal Training studio.

The entire project including demolition, construction and internal fit-out was completed successfully and within the specified time scales.

……………………………………………………………………………………………………………………………………………………………

Client: Clarity Optometry
Location: Bulimba

This detailed project involved the extensive renovation of an existing optometrist.  Due to the work that was involved the optometrist had to cease working for a short period of time.  Understanding the client’s position, CP Cowie worked all hours to complete the work to maximize productivity.  The project including the reconfiguring and fit out was completed in seven (7) days minimizing disruption and client expenses.

…………………………………………………………………………………………………………………………………………………………….

Client: Jerdanfield Towers
Location: St Lucia

CP Cowie Builders were engaged to construct a new façade, concrete path ways, block retaining walls and stairs for this residential high rise.

The project required safety and environmental issues such as pedestrian management and secure fencing.  CP Cowie addressed all these matters within the allotted schedule, without interrupting the residents and without incident.